Technical Report Breathless Floating Dock with Gazebo (updated)
The proposed Breathless Hotel Floating Dock with Gazebo is located in the Montego Freeport area in the parish of St. James…
Technical Report Breathless Floating Dock with Gazebo
The proposed Breathless Hotel Floating Dock with Gazebo is located in the Montego Freeport area in the parish of St. James…
NROCC Monetgo Bay Perimeter Road Presentation
Proposed Montego Bay Perimeter Road, Long Hill Bypass, and West Green and Barnett Street upgrade, St. James EIA
Environmental Impact Assessment
For the Montego Bay Perimeter Road, Long Hill Bypass and West Green and Barnett Street Upgrade, St James
Ecosystem Service and Natural Resource Valuation Assessment
Princess Hotel and Resorts Hanover Jamaica
Environmental Impact Assessment
Proposed Princess Hotels and Resorts Development at Cove, Hanover
Environmental Impact Assessment NFE SOUTH HOLDINGS LIMITED LNG TERMINAL AND PIPELINE PROJECT, OLD HARBOUR, ST. CATHERINE
Public Presentation
Environmental Impact Assessment PROPOSED OLD HARBOUR PLANT REPOWERING PROJECT (190 MW), OLD HARBOUR BAY, ST. CATHERINE, JAMAICA
Environmental Impact Assessment PHASE 2 OF THE PALISADOES REHABILITATION AND SHORELINE PROTECTION PROJECT, KINGSTON
ENVIRONMENTAL ASSESSMENT Jamaica North South Highway – Caymanas to Linstead Realignment
Environmental Impact Assessment CONSTRUCTION OF TWO BREAKWATERS AT LONG BAY, NEGRIL, WESTMORELAND